Posted 10 months ago

Position Summary

We are seeking a detail-oriented and driven Construction Estimator to join our team. The Estimator will be responsible for preparing accurate and comprehensive cost estimates for construction projects, analyzing drawings and specifications, coordinating with subcontractors and vendors, and supporting project teams from bid through award. The ideal candidate has strong analytical skills, field experience, and a solid understanding of construction means, methods, and materials.


Key Responsibilities

  • Review project plans, specifications, and related documents to prepare accurate cost estimates.
  • Develop detailed quantity take-offs and pricing for labor, materials, and equipment.
  • Solicit and analyze subcontractor and supplier quotes to ensure competitive pricing.
  • Assist with bid preparation and submission, including clarifications, exclusions, and scope letters.
  • Collaborate with project managers, engineers, and superintendents to ensure estimates align with project execution plans.
  • Maintain historical cost data and develop cost benchmarks for future projects.
  • Conduct site visits as needed to understand project conditions and constraints.
  • Participate in value engineering and constructability reviews.
  • Track and update cost changes, revisions, and addenda during the bidding process.
  • Support post-bid analysis and handoff meetings to project teams.

Qualifications

  • 3+ years of experience in construction estimating, preferably in commercial, industrial, civil, construction.
  • Strong understanding of construction documents, drawings, and specifications.
  • Excellent mathematical and analytical skills.
  • Strong communication and organizational skills with attention to detail.
  • Ability to work independently and meet bid deadlines.
  • Proficient in Microsoft Office Suite (Excel, Word, Project, Outlook).

Benefits

  • Competitive salary based on experience.
  • Health, dental, and vision insurance.
  • 401(k) with company match.
  • Paid time off and holidays.
  • Opportunities for growth and professional development

Position Summary We are seeking a detail-oriented and driven Construction Estimator to join our team. The Estimator will be responsible for preparing accurate and comprehensive cost estimates for cons...

Posted 1 year ago

We are seeking a Skilled Tradesman with a strong background in construction trades including, but not limited to, framing, drywall, finish carpentry, concrete, roofing, siding, and general repairs. This position requires reliability, attention to detail, and the ability to work independently or with a crew.

✅ Responsibilities

  • Perform hands-on construction tasks in various trades
  • Follow project blueprints, technical drawings, and job specs
  • Maintain safe and clean job sites
  • Operate tools and machinery safely and efficiently
  • Collaborate with project managers, foremen, and team members
  • Ensure high-quality workmanship and timely completion of tasks

🔧 Qualifications

  • 3+ years of experience in the construction industry
  • Proficient in multiple trades (carpentry, drywall, finish work, etc.)
  • Ability to read and interpret blueprints
  • Strong problem-solving skills and a positive attitude
  • Valid driver’s license and reliable transportation
  • Must be able to lift 50+ lbs and work in various weather conditions

💼 What We Offer

  • Competitive pay based on experience and skills
  • Consistent year-round work
  • Opportunities for advancement
  • Paid time off and holidays
  • Company-provided tools and safety gear
  • Supportive team culture

We are seeking a Skilled Tradesman with a strong background in construction trades including, but not limited to, framing, drywall, finish carpentry, concrete, roofing, siding, and general repairs. Th...

Posted 1 year ago

Job Summary: The Construction Project Manager is responsible for overseeing and managing all aspects of a construction project, from inception to completion. This includes coordinating with subcontractors, vendors, and internal teams to ensure that projects are completed on time, within budget, and in compliance with safety standards and quality specifications. The Project Manager plays a key role in planning, scheduling, budgeting, and ensuring the successful delivery of construction projects.

Key Responsibilities:

  • Project Planning and Coordination:
    • Develop project plans, timelines, and budgets, ensuring all resources are aligned to meet project goals.
    • Coordinate and schedule activities across all phases of the construction process, from design and pre-construction to post-construction.
    • Collaborate with architects, engineers, contractors, and other stakeholders to ensure that plans are followed, changes are tracked, and project goals are met.
  • Budget and Cost Management:
    • Create and maintain project budgets, ensuring that the project stays within financial constraints.
    • Review and approve vendor and subcontractor invoices, tracking expenses to ensure accurate financial reporting.
    • Identify potential cost overruns early and take corrective action to keep the project within budget.
  • Procurement and Contract Management:
    • Oversee the procurement of materials, labor, and equipment needed for the project, ensuring that all materials meet quality standards and are available when needed.
    • Negotiate and manage contracts with subcontractors, suppliers, and vendors to ensure favorable terms and compliance with project specifications.
    • Monitor subcontractor performance and ensure that contractual obligations are met.
  • Team Leadership and Supervision:
    • Lead, supervise, and mentor construction teams, including subcontractors, laborers, and support staff.
    • Ensure all team members adhere to project schedules, quality standards, and safety protocols.
    • Foster effective communication within the project team to ensure tasks are completed efficiently and on time.
  • Quality Control and Safety Management:
    • Monitor the construction site for adherence to safety standards, industry regulations, and quality requirements.
    • Conduct regular site inspections to assess quality of work and ensure safety protocols are followed.
    • Address and resolve any quality or safety issues promptly to prevent delays or accidents.
  • Project Documentation and Reporting:
    • Maintain detailed project records, including contracts, change orders, permits, and daily logs.
    • Prepare and submit regular progress reports to stakeholders, including updates on project timelines, budget, risks, and issues.
    • Ensure all required documentation is completed, filed, and accessible for audits or inspections.
  • Problem Solving and Risk Management:
    • Identify and address potential risks and issues that may affect project timelines, budgets, or quality.
    • Resolve conflicts between stakeholders, vendors, and subcontractors to keep the project on track.
    • Implement risk mitigation strategies to minimize disruptions and delays.
  • Client Communication and Relationship Management:
    • Act as the primary point of contact for clients, ensuring their expectations are met and their concerns are addressed promptly.
    • Provide regular project updates to clients and ensure transparency in decision-making and progress reporting.
    • Ensure the project meets client specifications and quality standards upon completion.

Skills and Qualifications:

  • Experience: Experience in construction project management, with a track record of successfully managing projects from initiation to completion.
  • Knowledge: Familiarity with project management principles, including budgeting, scheduling, and resource allocation.
  • Leadership Skills: Strong ability to lead, manage, and motivate a diverse team of construction professionals and subcontractors.
  • Communication Skills: Excellent verbal and written communication skills, with the ability to effectively communicate with clients, stakeholders, and project teams.
  • Problem-Solving: Strong analytical and problem-solving skills, with the ability to anticipate challenges and implement effective solutions.
  • Technical Knowledge: Solid understanding of construction methods, materials, and processes.
  • Attention to Detail: Ability to monitor and manage multiple tasks simultaneously, ensuring high-quality results and adherence to timelines.
  • Time Management: Strong organizational skills, with the ability to prioritize tasks and meet deadlines in a fast-paced environment.

Certifications and Licenses:

  • Valid driver’s license and ability to travel to job sites as required.

Working Conditions:

  • Primarily office-based with frequent visits to construction sites.
  • May require working in challenging weather conditions or in loud, busy construction environments.
  • Occasional long hours, including evenings or weekends, to meet project deadlines.

Physical Requirements:

  • Ability to walk, stand, and climb as needed to visit construction sites and monitor progress.
  • Ability to carry out site inspections and attend meetings.

Job Summary: The Construction Project Manager is responsible for overseeing and managing all aspects of a construction project, from inception to completion. This includes coordinating with subcontrac...

Posted 2 years ago

Position Title: Construction Equipment Operator

Job Summary: The Construction Equipment Operator is responsible for operating heavy machinery and equipment used in construction projects. This includes but is not limited to bulldozers, excavators, backhoes, front-end loaders, cranes, and skid-steer loaders. The operator plays a critical role in ensuring that construction sites are prepared and maintained in a safe and efficient manner.

Key Responsibilities:

  • Equipment Operation: Operate construction machinery such as bulldozers, excavators, graders, backhoes, cranes, front-end loaders, forklifts, and skid-steer loaders to move, lift, dig, and grade materials.
  • Site Preparation: Assist in preparing the construction site by digging trenches, leveling land, moving debris, and setting foundations for construction.
  • Maintenance and Inspection: Perform routine maintenance on equipment, including checking oil, fuel levels, and ensuring that machinery is in safe and working condition. Report any equipment malfunctions to the maintenance team.
  • Safety Compliance: Adhere to all safety standards, procedures, and regulations while operating machinery. Ensure that all safety equipment is used and that the worksite is secure.
  • Collaboration: Work closely with other crew members and supervisors to meet deadlines and ensure the project progresses smoothly.
  • Material Handling: Load and unload construction materials from trucks or storage areas and place them appropriately at work sites.
  • Survey and Grade Land: Assist in grading land, digging and filling trenches, and moving materials to ensure the project site is level and safe for construction.
  • Record Keeping: Maintain daily logs and reports of activities, equipment usage, and any issues encountered during operation.

Skills and Qualifications:

  • Experience: Proven experience operating construction equipment or a related field (typically 1-3 years).
  • Physical Fitness: Ability to perform physical tasks such as lifting, bending, and standing for long periods.
  • Technical Knowledge: Knowledge of construction techniques, equipment capabilities, and safety procedures.
  • Attention to Detail: Ability to follow detailed instructions, read construction plans, and monitor the condition of equipment.
  • Communication Skills: Ability to communicate effectively with supervisors and fellow crew members.
  • Problem-Solving Skills: Ability to identify and troubleshoot issues with machinery and work processes.

Working Conditions:

  • May require working in various weather conditions, including heat, rain, or snow.
  • Worksite is typically outdoors with exposure to noise, dust, and heavy equipment.
  • May require overtime or weekend work to meet project deadlines.

Physical Requirements:

  • Must be able to lift and move heavy objects (up to 50 lbs or more) and operate machinery for extended periods.
  • Must be able to work in tight or confined spaces and on uneven terrain

Position Title: Construction Equipment Operator Job Summary: The Construction Equipment Operator is responsible for operating heavy machinery and equipment used in construction projects. This includes...

Posted 2 years ago

Job Summary: The Construction Site Superintendent is responsible for overseeing the day-to-day operations on a construction site, ensuring that the project is completed on time, within budget, and according to quality standards. This role involves managing subcontractors, coordinating with vendors, ensuring safety compliance, and maintaining communication between the project team and stakeholders.

Key Responsibilities:

  • Project Oversight: Manage and supervise all on-site activities, including construction, safety, and coordination of subcontractors and vendors.
  • Team Leadership: Lead and direct a team of construction workers, subcontractors, and laborers. Ensure tasks are performed efficiently, on time, and in accordance with the project specifications.
  • Scheduling and Coordination: Develop, monitor, and adjust the construction schedule. Coordinate and prioritize work activities to avoid delays and keep the project moving forward smoothly.
  • Quality Control: Ensure that work is completed according to project plans, specifications, and industry standards. Conduct regular inspections to maintain quality control and resolve issues when necessary.
  • Safety Management: Enforce safety regulations on-site and ensure all workers follow safety protocols. Conduct safety meetings and ensure that safety equipment is used at all times. Investigate any safety incidents or accidents.
  • Material and Equipment Management: Coordinate the delivery and use of materials and equipment. Ensure that the right materials are on-site at the right time, and that equipment is in good working condition.
  • Client and Stakeholder Communication: Act as the main point of contact between the project manager, clients, and contractors. Provide regular updates on progress, milestones, and any potential issues.
  • Problem-Solving: Address and resolve any on-site issues, including delays, disputes, or unforeseen challenges. Ensure timely solutions to keep the project on track.
  • Documentation: Maintain accurate records of construction activities, daily logs, site progress reports, and any changes or modifications to plans. Ensure compliance with building codes and regulations.
  • Budget Management: Work with the project manager to monitor project costs, prevent cost overruns, and manage any budget adjustments as necessary.
  • Regulatory Compliance: Ensure the project complies with all local, state, and federal building codes, regulations, and laws. Secure necessary permits and licenses.

Skills and Qualifications:

  • Experience: Experience in construction management or as a superintendent, with proven experience leading projects from start to finish.
  • Leadership Skills: Strong leadership, management, and team-building skills to effectively supervise workers and subcontractors.
  • Project Management Knowledge: Familiarity with construction processes, timelines, and budgeting.
  • Communication Skills: Excellent written and verbal communication skills to effectively interact with team members, clients, and stakeholders.
  • Problem-Solving Skills: Ability to make quick decisions and resolve on-site challenges efficiently.
  • Attention to Detail: Ability to spot potential issues or deviations from plans and address them proactively.
  • Computer Proficiency: Familiarity with project management software, scheduling tools, and basic office software (e.g., MS Office
  • Safety Knowledge: In-depth knowledge of construction site safety practices and OSHA standards.

Working Conditions:

  • Primarily on-site work in outdoor settings, with exposure to various weather conditions.
  • May require working in confined spaces, elevated heights, or challenging terrain.
  • Long hours, including evenings or weekends, may be necessary to meet project deadlines.

Physical Requirements:

  • Ability to lift up to 50 lbs, walk, stand, and climb for extended periods.
  • Must be comfortable working in physically demanding environments and managing heavy equipment.

Job Summary: The Construction Site Superintendent is responsible for overseeing the day-to-day operations on a construction site, ensuring that the project is completed on time, within budget, and acc...

Posted 2 years ago

Job Summary: The Concrete Laborer is responsible for assisting in the preparation, pouring, and finishing of concrete for construction projects. This role involves handling tools and materials, maintaining a safe and clean work environment, and ensuring that concrete is poured and finished according to specifications.

Key Responsibilities:

  • Concrete Preparation: Assist in preparing the site for concrete pouring, including setting forms, cleaning surfaces, and ensuring proper alignment and leveling.
  • Concrete Mixing: Mix, pour, and spread concrete in accordance with specifications. Use hand tools or machinery for mixing, pouring, and finishing concrete as needed.
  • Form Setting: Set and align concrete forms and molds to ensure the desired shape and finish for walls, floors, driveways, sidewalks, and other concrete structures.
  • Concrete Pouring and Finishing: Assist in pouring concrete into forms and using tools to smooth, level, and finish surfaces. This may include finishing concrete with trowels, floats, or other equipment to achieve the required texture.
  • Reinforcement Installation: Install reinforcement bars (rebar) or wire mesh into forms to reinforce concrete structures before pouring.
  • Surface Maintenance: Assist with surface treatments such as applying curing compounds, smoothing edges, and performing surface repairs.
  • Material Handling: Move and distribute materials like gravel, sand, cement, and other tools or equipment required for the job.
  • Cleanup: Maintain a clean and organized worksite by cleaning tools, equipment, and removing any debris or leftover materials after completing tasks.
  • Safety Compliance: Follow all safety protocols, including the use of personal protective equipment (PPE) such as gloves, helmets, and safety glasses. Report any safety hazards or accidents to the supervisor.
  • Tool Operation and Maintenance: Operate basic tools and machinery, including wheelbarrows, shovels, vibrators, and power tools, while ensuring they are well-maintained and in good working condition.
  • Collaboration: Work closely with other laborers, carpenters, and construction crew members to ensure the timely and efficient completion of projects.

Skills and Qualifications:

  • Experience: Previous experience in concrete work or construction is preferred but not required; on-the-job training is often provided.
  • Physical Stamina: Ability to perform physically demanding tasks such as lifting heavy materials, bending, standing, and working in varying weather conditions.
  • Attention to Detail: Ability to follow instructions precisely and ensure that concrete is mixed and applied to meet specific requirements.
  • Teamwork: Ability to work well with others and communicate effectively on a construction site.
  • Problem-Solving Skills: Ability to identify and address minor issues that arise during the pouring and finishing processes.
  • Safety Awareness: Knowledge of basic construction site safety procedures and willingness to follow them at all times.
  • Equipment Handling: Ability to operate and maintain hand tools and basic machinery used in concrete work.

Education Requirements:

  • High School Diploma or equivalent (preferred).

Working Conditions:

  • Work is typically performed outdoors and may involve exposure to varying weather conditions, including extreme heat, cold, or rain.
  • The role involves frequent physical labor, including heavy lifting, bending, and standing for long periods.
  • May require working in noisy environments and with hazardous materials, including cement and other chemicals.

Physical Requirements:

  • Must be able to lift and carry heavy loads (up to 50 lbs or more).
  • Ability to perform manual tasks such as digging, carrying, and handling heavy tools and materials.
  • Ability to bend, kneel, and squat for extended periods.

 

Job Summary: The Concrete Laborer is responsible for assisting in the preparation, pouring, and finishing of concrete for construction projects. This role involves handling tools and materials, mainta...