our builds
Baker 300 Aviation Hangar
Delivered through our comprehensive Design/Build approach, the Baker 300 Aviation Hangar exemplifies single-source responsibility and streamlined project delivery. This integrated design/build process ensured seamless collaboration between our design and construction teams, resulting in faster delivery, enhanced cost control, and superior quality outcomes for this specialized aviation facility.
This impressive 11,600-sf private hangar showcases the efficiency of our Design/Build methodology, featuring premium amenities including a 25′ x 80′ Norco Door, epoxy floors, (4) 150,000 btu Reznor heaters, Generac generator, METARmaps, and a 20′ Go Fan Yourself fan. Beyond aircraft storage, the building incorporates carefully planned office spaces, a dedicated maintenance area, and a conference room – all seamlessly integrated through our collaborative design/build process that eliminates the traditional gaps between design and construction phases.
Work with us

